Chippewa Falls High School CTE & STEM Upgrades

ATSR guided Chippewa Falls Area Unified School District in long-term planning to meet the District’s needs.

The master plan includes:

  • Enrollment capacity analysis/forecast
  • Comprehensive 25-year facilities timelines
  • Major capital improvements per building
  • Facility age/useful life breakouts per building
  • Property acquisition options

CTE & STEM Suite

As a result of a successful $65 million bond referendum, ATSR designed an addition with major alterations throughout the high school for Chippewa Falls Area Unified School District.

The project includes:

  • A high-performance tech education suite with STEM learning spaces
  • Lab areas
  • Project-based learning pods
  • Student flexible areas.
  • Major mechanical, electrical, and technology work occurred throughout the facility.

Client:

Chippewa Falls Area Unified School District

Location:

Wisconsin

Type:

Addition & Alterations