ATSR guided Chippewa Falls Area Unified School District in long-term planning to meet the District’s needs.
The master plan includes:
- Enrollment capacity analysis/forecast
- Comprehensive 25-year facilities timelines
- Major capital improvements per building
- Facility age/useful life breakouts per building
- Property acquisition options
CTE & STEM Suite
As a result of a successful $65 million bond referendum, ATSR designed an addition with major alterations throughout the high school for Chippewa Falls Area Unified School District.
The project includes:
- A high-performance tech education suite with STEM learning spaces
- Lab areas
- Project-based learning pods
- Student flexible areas.
- Major mechanical, electrical, and technology work occurred throughout the facility.